For narrow and metre gauge lines
FAST NG (Narrow Gauge) is a ballastless track system optimised for narrow and metre gauges, ensuring high performance from installation to maintenance. It offers simplified installation and significantly reduces maintenance costs, overcoming the limitations of traditional ballastless tracks. Flexible and reliable, FAST NG adapts to various contexts, from the construction to the renewal of railway, tram, and metro lines, with minimal impact on circulation.

Minimal service interruption
Slabs can be installed during temporary or partial track possession by means of a patented laying system. This allows railway traffic to resume before mortar is poured, thanks to temporary supports that can withstand railway loads.
Correct position of rail seats
FAST NG slabs, produced using a variable geometry system developed and patented by Overail, ensure the correct positioning of rail seats on bends.
Compliance with alignment tolerance
During installation, the temporary supports and variable geometry system ensure full compliance with design tolerances, without the need for adjustments allowed by the adjustable fastening system.
Maintenance over time
The inherent adjustment range of the fastening system is left entirely at the disposal of the infrastructure manager for any future maintenance.
Easy slab replacement
Thanks to the separation mat, prefabricated slabs are easily replaced in exceptional circumstances, by re-inserting the bolts into the original seats of the temporary supports.
Customisation
The system is available in multiple configurations to meet various needs, such as vibration and noise reduction, emergency vehicle access, or the installation of a third rail.
Length | 2,125 mm |
Width | 2,085 mm |
Weight including fasteners | 2,500 kg |
Rail seats | 3+3 |
Track gauges | 950-980 1000-1030 |
Fastener spacing | 950-980 750 mm |
Distance between rail base and upper surface of slabs | 60.8 mm |
Minimum radius of curvature | 40 m |